From idea to a validated MVP — without building the wrong product
Forge turns a raw idea into a structured, documented MVP that is ready for your technical team. A journey guided across 12 stages, with a score that tells you the right moment to build and a PRD that comes out dev-ready.
12 guided stages · MVP Readiness Score · dev-ready PRD
Most of the waste happens before the first line of code
Forge brings method to the very start: it validates the assumptions, measures readiness and delivers a clear package — so you only spend on development once you know it is worth it.
Method, not improvisation
A journey guided across 12 stages takes the raw idea to a structured MVP. Every decision has its place, order and reason — no building in the dark, no loose brief that grows out of control.
Know when to build
The MVP Readiness Score shows, in real time, how ready the project is for development and which areas still weigh on it. You decide with a number, not a hunch.
Handoff without noise
PRD, business rules, data model and backlog come out ready and exportable. The technical team gets a clear scope and codes the right product from day one.
An entire product, in a single flow
From diagnosis to handoff, every piece of the MVP has its place — and comes out dev-ready.
12 guided stages
From diagnosing the problem to the launch plan, a track that leaves no gap along the way.
MVP Readiness Score
A maturity score with history, showing what is already solid and what is still missing.
PRD and documents
Generates a consolidated PRD, business rules and technical prompts, ready for the dev.
Risks and hypotheses
Records what needs validating before building — cutting rework and waste.
Backlog and roadmap
Prioritizes what goes into (and stays out of) the MVP and plans deliveries with clarity.
Data matrix and benchmark
Models the product entities and compares them against real market references.
From concept to handoff in four moves
No months-long project. You diagnose, structure, document and deliver.
Start with the problem: context, audience, objective and the core hypotheses of the MVP.
Work through the 12 guided stages and watch readiness rise with every decision recorded.
PRD, business rules, data model and backlog come out structured and versioned.
Export to Markdown/JSON and hand off to development without noise.
A number that tells you when to build
Readiness consolidates every stage of the journey into a single panel: what is already solid, what still weighs on it and where to invest the next decision. No more unanswered 'is it ready?'.
The validated idea does not die at handoff
What comes out of Forge feeds the rest of Centriu — from the structured MVP to build, launch and data-driven decisions.
Genesis builds what Forge specified · Run takes it to launch and operation · Oracle measures the outcome · Vesper keeps the context alive.
Made for
Module plans
Three tiers that unlock more as you grow. On Max, you get access to everything.
Starter
Essentials to start
- Guided idea diagnosis
- Consolidated project hub
- Risk and hypothesis log
- MVP Readiness Score
Pro
Full operation
- Guided idea diagnosis
- Consolidated project hub
- Risk and hypothesis log
- MVP Readiness Score
- Full 12 guided steps
- Prioritized backlog and roadmap
- PRD and document generator
Max
EverythingEverything unlocked
- Guided idea diagnosis
- Consolidated project hub
- Risk and hypothesis log
- MVP Readiness Score
- Full 12 guided steps
- Prioritized backlog and roadmap
- PRD and document generator
- Benchmark against market references
- Entity data matrix
- Markdown/JSON exports for handoff
- Integrations across Centriu systems
