Skip to content
Centriu
Centriu Flow

Workflow Automation for Architecture Firms: Project-Phase Updates That Fire Without Anyone Chasing the Calendar

An architecture project moves through phases that can each run for months — schematic design, design development, permit submission, construction administration — and a client left without an update for weeks starts to wonder if anything is happening at all. Centriu Flow’s no-code platform lets a firm configure phase-based client update reminders once per project, tied to real milestones, so a client hears from the firm on a predictable cadence without a project architect needing to remember to send it personally.
Phase-based milestone updates
No-code configuration
Team collaborating around a table with a laptop
Automation handles the repeatable work; people keep the judgment calls.

Why architecture projects need a genuinely different cadence than a one-time event

Most cadence automation is built around a single, near-term date — a reminder before an appointment, a countdown to an event. An architecture project’s cadence is the opposite: it unfolds over months, through phases that each have their own milestones — a schematic design review, a permit submission, a construction-administration site visit — and a client needs to hear something meaningful at each of them, not just at the very end. Centriu Flow’s no-code automation platform lets a firm configure that longer-horizon, phase-based cadence directly.

How the underlying problem shows up before you fix it

A client goes weeks without hearing from the firm during a long design phase and starts to wonder if the project has stalled.

A permit-submission milestone passes without the client being told, and they find out only when they happen to ask.

Each project’s update schedule is tracked in a separate document, recreated by hand for every new commission.

A project architect means to send a phase-completion update but it slips during a busy week, and the client notices the gap.

Setting up a new automated update for a new project phase requires outside technical help.

Why this keeps happening without a phase-based automation layer

An architecture project’s phases are inherently long and milestone-based rather than date-fixed, which a simple, near-term reminder tool has no native way to track. Without automation tied to each phase’s actual milestone, client updates depend on a project architect remembering to send them personally amid the actual design and technical work — which does not hold up consistently across every simultaneous project a firm is running.

How Centriu Flow automates a project’s phase-based cadence

Flow’s no-code platform lets a firm configure a client update tied to each phase’s actual milestone — schematic design complete, permit submitted, construction administration site visit scheduled — without needing a developer for each new project or phase. Because Flow spans marketing, sales and support in one platform, the same configuration approach covers a project’s entire lifecycle, from initial engagement through construction administration.

What is actually built today

No-code configuration of phase-based client updates tied to a project’s actual milestones.

Reusable cadence templates a firm can apply to a new project without rebuilding from scratch.

Updates configurable across a project’s full lifecycle, from initial engagement through construction administration.

One platform for client-facing updates across every simultaneous project a firm is running.

A firm running two projects at different phases at once (illustrative scenario, not a real client)

For a project entering design development, the firm configures the phase cadence once: an update when schematic design is approved, another when the permit is submitted, another when construction administration begins.

Three weeks later, the permit-submission update fires automatically to the client, without the project architect needing to remember it personally while also managing a second project in an earlier phase.

The reusable template configured for this project is applied directly to a new commission the following month, without rebuilding the cadence from scratch.

What changes operationally

The structural change is client updates that fire reliably at each phase’s actual milestone, configured once per project instead of depending on a project architect’s memory across every simultaneous commission. What that is worth in client satisfaction depends heavily on a firm’s own project mix and client relationships — Centriu does not attach a specific figure that would generalize.

When this is not the right fit

A firm running only one project at a time, with informal updates easily managed personally, may not yet need dedicated automation for this specifically.

Updates depending on memory across simultaneous projects vs. a cadence tied to real milestones

When client updates depend entirely on a project architect remembering to send them amid the actual design work, the projects most likely to go quiet are exactly the ones competing with several others for attention. Centriu Flow’s no-code approach lets the firm configure the cadence once per project, tied to real milestones, so updates fire reliably regardless of how many other projects are running at once.

Related systems

Main system: Centriu Flow.

What it does NOT do

  • Does not track permit approval status with a government agency — it sends the update the firm configures once that milestone is reached internally.
  • Does not perform architectural or engineering work itself — it automates the client communication tied to project milestones.
  • Does not send an update without the milestone it is tied to actually being reached.
  • Does not merge project or contact data across different firms using Flow — each account only sees its own flows.

Security and governance

Each firm using Centriu Flow only sees its own flows, contacts and message history — nothing is shared across accounts. Personal data processed by an automated flow follows Brazil’s LGPD (Law No. 13,709/2018). Full detail on access control and audit trails lives at /governanca and /iso.

Pricing and contracting

Available by monthly subscription, with tiered plans. Values and terms come from the official pricing table at /precos (Centriu's central source — never restated here).

Frequently asked questions

Can client updates be tied to a project’s actual phase milestones?

Yes — Flow’s no-code platform lets a firm configure that cadence directly, tied to each milestone.

Does Flow track permit status with a government agency?

No — it sends the update the firm configures once a milestone is reached internally; it does not monitor an external agency.

Can a cadence be reused for a new project without rebuilding it?

Yes — a firm can apply a configured template to a new commission.

Does this cover the whole project lifecycle, or just one phase?

Updates can be configured across the full lifecycle, from initial engagement through construction administration.

What does Centriu Flow cost?

It has one of the platform’s lower published starting prices — exact current values are on the central pricing page.

See how Centriu Flow automates architecture project updates

Reach our commercial team directly, or leave your details below — we'll follow up with guidance for your case.

Sources

  1. Centriu Flow — public product page — Centriu, 2026-07-20 · link(primária)
  2. Centriu Flow — public factsheet (API, JSON) — Centriu, 2026-07-21 · link
  3. Law No. 13,709/2018 — Brazil’s General Data Protection Law (LGPD) — Presidência da República (Brazil), 2018-08-14 · link

Last material update on .

By · AI-assisted production, with human review